North Lamar Boulevard corridor project
North Lamar Boulevard corridor project
Mobility, safety and connectivity improvements are coming to Lamar Boulevard from US 183 to Howard Lane. The improvements are funded by the 2016 Austin Mobility Bond.
About the Project
Status: Complete
Scope Reduced
Completed Improvements
South of US 183 to Rundberg Lane
- Intersection improvements at Payton Gin Road
- shared-use paths
- high-visibility crosswalks
- upgraded/new traffic signals at Fairfield Drive, Grady Drive and Powell Lane
- crosswalk signal (pedestrian hybrid beacon or PHB) at Cooper Drive
- removal of the "pork chop" median island at Morrow Street
- relocated bus stops for better transit access
US 183 to Rundberg Lane
- bicycle and pedestrian facilities
- bus stops
- driveways and curb ramp improvements with ADA compliance
Rundberg Lane to Parmer Lane
- shared-use pedestrian bridge over Walnut Creek
- upgraded sidewalks and bike lanes
- traffic signal improvements
North Lamar Boulevard corridor project
Documents
NoLa-Burnet - Appendix - A - Recommended Improvements.pdf
NoLa-Burnet - Appendix B - Cost_Estimates.pdf
NoLa-Burnet - Appendix C - PIP.pdf
NoLa-Burnet - Appendix D - Drainage Improvements.pdf
NoLa-Burnet - Appendix E - Traffic_Counts.pdf
NoLa-Burnet - Appendix F - Traffic_Analysis.pdf
NoLa-Burnet - Executive Summary.pdf
North Lamar - Burnet Corridor Report - 2013-12.pdf
This is hidden text that lets us know when google translate runs.