Burnet Road Corridor Project

Burnet Road Corridor Project

About the Project

Burnet Road Corridor Header

About the Project

The City of Austin is improving Burnet Road from Koenig Lane to MoPac Expressway to make traveling along and across the corridor safer and easier for people walking, biking, driving and riding transit.

Funded by the voter-approved 2016 Austin Mobility Bond, the project includes sidewalks and shared-use paths, accessible crossings, bus stop improvements, intersection and traffic signal upgrades, roadway repairs and drainage improvements. Features vary by section.

The project is divided into three sections:

  • South: Koenig Lane to US 183
  • Central: US 183 to Bright Verde Way
  • North: Bright Verde Way to MoPac Expressway

Construction is happening in phases, with a separate schedule for each section. Explore the sections below for improvements, construction progress and anticipated completion dates.

Burnet Road Corridor project limits map

Project Timeline

All three sections are under construction, with separate completion schedules.

  1. March 2026

    South and Central
    Construction began.

  2. June 2026

    North
    Construction began.

  3. Current Status
    • South: Under construction
    • Central: Under construction
    • North: Under construction
  4. August 2027

    Central
    Anticipated completion.

  5. October 2028

    North
    Anticipated completion.


South Section

Koenig Lane to US 183

Explore the South Section Map

Select a purple circle to view the detailed intersection map. You can also use the text links below. Maps open in a new tab.

Burnet Road improvements from Koenig Lane to US 183.

Detailed Intersection Maps

All links open in a new tab.

Planned Improvements

  • Sidewalks and shared-use paths for people walking and biking.
  • Accessible curb ramps.
  • Curb and gutter installation.
  • Limited driveway reconstruction.
  • Traffic signal infrastructure upgrades and improvements at priority intersections.

Previously Completed Improvements

Koenig Lane to White Horse Trail

  • Improved crossings and medians for safety
  • Traffic signal upgrades
  • Added turn lanes, including an RM 2222 right-turn lane
  • Landscaped buffer near schools
  • Shared-use paths along RM 2222
  • Bus stop improvements
  • Placemaking and streetscape improvements

White Horse Trail to US 183

  • Crosswalk signal (pedestrian hybrid beacon, or PHB) at Twin Oaks Drive
  • Crosswalk signal (PHB) at Penny Lane/Doris Avenue
  • Crosswalk signal (PHB) south of US 183

Current Construction

Construction began in March 2026. Work is happening in phases on walking and biking facilities and priority intersection improvements.

Expect lane shifts, temporary detours and changes to access as work moves through the section. Follow posted signs and allow extra travel time.


Central Section

US 183 to Bright Verde Way

Explore the Central Section Map

Select a purple circle to view its detailed intersection map. You can also use the text links below. Maps open in a new tab.

Burnet Road improvements from US 183 to Bright Verde Way.

Detailed Intersection Maps

Planned Improvements

  • Eight-foot-wide shared-use paths for people walking and biking.
  • Bus stops designed for safer access by people walking, biking and riding transit, with accessible boarding areas.
  • Intersection and traffic signal improvements at Research Boulevard, Waterford Center Boulevard, Longhorn Boulevard and Rutland Drive.
  • Pavement repairs, new pavement markings and signs.
  • Curb and gutter installation and driveway reconstruction.
  • Utility adjustments and drainage improvements, including stormwater detention and water quality structures.
  • Trees and landscaping along walking and biking facilities.

Previously Completed Improvements

  • Bike and pedestrian improvements around Q2 Stadium and Kramer Station.

Current Construction

Construction update: September 30, 2026

Crews continued drainage and water-line construction, concrete work and shared-use path preparation. Traffic signal work progressed at Longhorn Boulevard and Waterford Center Boulevard, with additional foundation work remaining at Rutland Drive.

Anticipated completion: August 2027.

Expect lane shifts, temporary detours and changes to access as work moves through the section. Follow posted signs and allow extra travel time.


North Section

Bright Verde Way to MoPac Expressway

North section project limits map coming soon.

This section extends along Burnet Road from Bright Verde Way to MoPac Expressway.

Planned Improvements

  • New sidewalks, bike lanes and shared-use paths.
  • Raised medians and turn lane improvements.
  • Curb and gutter installation and driveway reconstruction.
  • Bus stop improvements.
  • Pavement repairs, new pavement markings and signs.
  • Utility adjustments and drainage improvements.

Previously Completed Improvements

  • Braker Lane sidewalk and intersection improvements
  • Bus stop relocated near Bright Verde Way

Current Construction

Construction update: September 29, 2026

Construction began in June 2026. Crews continued curb and gutter construction, shared-use path preparation, storm-drain installation and traffic signal conduit work at Esperanza Crossing.

Anticipated completion: October 2028. 

Expect lane shifts, temporary detours and changes to access as work moves through the section. Follow posted signs and allow extra travel time.

Planning Documents

Explore earlier corridor studies and recommendations. These historical materials may differ from the improvements now under construction.

All documents open in a new tab.

Contact

For questions or comments, please email MobilityBonds@AustinTexas.gov or call 512-974-2300.

October 13, 2026 Construction Update

North Section:
Bright Verde Way to MoPac Expressway

Temporary Lane Closures:

  • Beginning the week of October 19, 2026, crews will be working on Burnet Road between Brockton Drive and Kramer Lane. Access via Brockton Drive may be temporarily impacted by this work; please use Kramer Lane to access Brockton Drive during the intersection closure. 
  • Beginning the week of November 2, 2026, southbound Burnet Road will be reduced by one lane. This will effectively continue the existing lane closure south of Gault Lane. The northbound lane closure on Burnet Road approaching Gault Lane will be removed.

Crews continued:

  • Preparing shared-use paths for walking and biking.
  • Constructing curb and gutter south of Gault Lane.
  • Installing storm drains.
  • Installing underground traffic signal conduit at Esperanza Crossing.

Anticipated completion: October 2028. The schedule is subject to change.

Expect lane shifts, temporary detours and changes to access as construction progresses. Follow posted signs and allow extra travel time.

September 29, 2026 Construction Update

North Section:
Bright Verde Way to MoPac Expressway

Crews continued:

  • Preparing shared-use paths for walking and biking.
  • Constructing curb and gutter toward Gault Lane.
  • Installing storm drains.
  • Installing underground traffic signal conduit at Esperanza Crossing.

Anticipated completion: October 2028. The schedule is subject to change.

Expect lane shifts, temporary detours and changes to access as construction progresses. Follow posted signs and allow extra travel time.

August 3, 2026 Project Update

Construction is underway in three sections of Burnet Road:

  • SOUTH: Koenig/2222 to US 183
  • CENTRAL: US 183 to Bright Verde Way
  • NORTH: Bright Verde Way to MoPac Expressway

Crews are installing utilities, upgrading intersections and adding walking and biking facilities. Work is happening in phases along the corridor.

As construction progresses, expect lane shifts, temporary detours and intermittent closures. Follow posted signs and allow extra travel time.